Framing the Building:

Along with spring came a big chain-link fence and a lot of building material!

The first major structure to go up was our elevator shaft. Our staff was very happy to see we were indeed getting an elevator. This will aid in getting arthritic, injured, and immobile pets down to our inpatient area for treatment. No more struggling down the stairs or long walks around the building!

Next was the progress of framing, which was going rather quickly. We were very optimistic that our expansion might just be done on time.

Adding the Second Floor:

The construction of the second floor was a very exciting thing to watch. This level will house our new exam rooms, waiting area and doctor’s offices. Above the exam rooms, on our third floor, will be our new conference room. We will have enough space for the whole staff to attend educational seminars!